National Assembly for Wales
The site has a powerful presence, with uninterrupted views over Cardiff Bay. The resulting building, with vistas of sky and water, looks outwards to Wales and beyond.
The election of the Welsh National Assembly in 1999, was a turning point in the history of Wales. Its home, Cardiff’s former docklands, is a striking addition to the local scene and a statement of faith in the regeneration process. The Assembly building embodies democratic values of openness and participation, while its progressive environmental agenda establishes a new standard for public buildings in Britain.
The setting is the Pierhead, once the centre of the coal exporting trade. Nearby are the Grade I listed Pierhead Building and the new Wales Millennium Centre. The idea of openness is exemplified by the transparency of the building. Public spaces are elevated on a slate-clad plinth and cut away to allow daylight to penetrate the administrative spaces at lower level. A light-weight, gently undulating roof shelters both internal and external spaces, pierced by the protruding extension of the Debating Chamber.
A large circular space at the heart of the building, the Chamber is defined by the dramatic roof which is drawn down from the roof above to form the enclosure. The Assembly also includes exhibition and education spaces, a café, committee and meeting rooms, press facilities, offices for the principal officers of the Assembly and a members’ lounge.
The servicing strategy responds to the varying demands of the internal spaces – air-conditioning is supplied in the debating chamber, while the public lobby is naturally ventilated. Heat exchangers capitalise on the potential of the ground as a cooling mechanism, while the thermal mass of the plinth tempers fluctuations in the internal environment. In this way, the design achieves significant energy savings compared to traditional buildings.
Hard landscaping, together with a canopy of trees, creates a close for the Assembly and completes the jigsaw of new development in this part of Cardiff Bay.
Project information:
- Place/Date: Cardiff, Wales 1998 - 2005
- Client: National Assembly for Wales
- Cost: £41 million
- Gross Internal Area: 5,308 m²
- Architect: Richard Rogers Partnership
- Structural Engineer: Arup
- Environmental Consultant: BDSP Partnership
- Project Manager: Schal
- Landscape Architect: Gillespies
- Fire Consultant: Warrington Fire Research
- Acoustic Consultant: Sound Research Laboratories
- Access Consultant: Vin Goodwin Access Consultant
- Broadcasting Consultant: Department Purple
- Wind Engineering Consultant: Arup
- Façade Engineer: Arup
- Bomb Blast Consultant: TPS Consult
Awards
- Civic Trust Award, 2008
- RIBA Award National, 2006
- RIBA Stirling Prize Building of the Year Shortlist, 2006
- Structural Steelwork Design Award, 2006
- Gold Medal in Architecture, National Eisteddfod, 2006
- Natural Stone Award, 2006
--RSHP
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February